Home>Products

settlement sensors

The JMCJ-1003/1005 magnetic ring settlement water level gauge gives Kingmach settlement sensors a manual borehole method for layered ground. It measures underground settlement by electromagnetic induction between the probe and magnetic rings, and it measures water level by conductivity when the probe contacts groundwater. The instrument uses a probe, reel, tape, battery, audible or visual indication, and magnetic rings placed at known depths. Published depth options include 30 m, 50 m, and 100 m, with plus or minus 1 mm accuracy, 9V battery power, maximum current of 50 mA, a probe about 17 cm long and 3 cm in diameter, and -20 degrees Celsius to 60 degrees Celsius operating environment. This product is useful where the engineer needs to know which soil layer compressed, not just how much the surface moved. A careful log should keep borehole number, ring depth, water depth, reference mark, operator, weather, and construction activity together for each visit.

Application of  settlement sensors

Application of settlement sensors

In bridge deflection and pier foundation monitoring, settlement sensors help engineers follow vertical behavior that may change with traffic, temperature, bearing response, scour, or foundation compression. Kingmach JMQJ-62XXADT micro range hydrostatic level sensors provide 50 mm and 100 mm ranges, 0.01 mm resolution, RS485 output, and IP68 protection for small movements near decks, piers, or abutments. JMDL-62XXADT hydrostatic sensors can connect several measuring points through tubes, allowing a bridge team to compare related locations against a common reference instead of reading each point alone. A practical layout may place sensors near pier caps, bearing seats, approach slabs, or foundation observation positions, depending on the risk being tracked. The daily review should not look at the settlement curve by itself. Traffic loading, temperature swing, inspection findings, bearing condition, river level, and nearby structural instruments give the curve meaning. If a pier point drifts while the deck and approach slab stay stable, the cause is different from a whole-span temperature response. Clear naming, stable reference control, and consistent reading intervals turn small vertical changes into usable maintenance evidence.

The future of settlement sensors

The future of settlement sensors

Remote infrastructure will shape the future of settlement sensors. Many settlement points sit along long railways, expressways, dams, embankments, slopes, and tunnel portals where routine manual reading is expensive and sometimes unsafe. Low-power acquisition, wireless gateways, solar power, and clear cabinet layouts can reduce unnecessary visits while keeping settlement trends visible. Kingmach hydrostatic sensors and settlement gauges that support remote data collection can fit this direction, especially when RS485 channels, power supply, and reference points are documented well. Remote monitoring should still include scheduled field checks, because tubes, probes, cables, and reference points can be affected by weather and construction. The best future setup will combine fewer emergency trips with better evidence for deciding when a site visit is truly needed. The practical goal is to keep settlement data understandable after the original installation crew has left, so owners can compare old and new readings without reconstructing the field history from memory. The same record should remain readable for designers, contractors, owners, and maintenance teams, because settlement monitoring often continues long after the first construction report is finished.

Care & Maintenance of settlement sensors

Care & Maintenance of settlement sensors

Baseline control for settlement sensors is a continuing maintenance task. A zero value should be recorded only after plates, rods, anchors, hydrostatic tubes, reference sensors, magnetic rings, probes, cabinets, and power supply are stable. If the baseline is taken during active compaction, dewatering, grouting, traffic vibration, or support adjustment, every later value may be difficult to explain. Kingmach products can support manual or remote readings, but both methods need a clear starting point. Keep the baseline date, weather, water level, construction stage, operator, and instrument status in the file. If a point must be reset, keep the old value, the new value, and the reason for the change. Do not erase earlier trend data to make a curve look tidy. Future reviewers need to know when the measuring system changed, otherwise normal maintenance can be mistaken for real ground movement.

Kingmach settlement sensors

settlement sensors are used when vertical movement must be measured before it becomes visible as cracks, uneven pavement, rail irregularity, or structural distress. Kingmach settlement products cover embedded single-point measurement, hydrostatic leveling, wide-range differential pressure monitoring, magnetic ring settlement and water level reading, and micro range deflection monitoring. On a roadbed, the reading may show whether filling and compaction are stabilizing. On a bridge, it may show deflection relative to a reference point. In a foundation pit, it may show base uplift after excavation or dewatering. The key is to treat settlement as a time-based record, not a one-time survey value. Each point should carry its model, range, reference point, baseline, installation depth, and acquisition channel so later engineers can understand what moved, when it moved, and why the value matters. During review, the team should compare the value with nearby points, construction timing, water condition, and inspection notes before deciding whether the movement is acceptable.

FAQ

  • Q: What is JMCJ-1003/1005 used for?
    A: It is used to measure layered underground settlement and groundwater level in foundations, subgrades, foundation pits, embankments, and underground structures.

    Q: How does magnetic ring settlement reading work?
    A: Magnetic rings are placed underground; when the probe senses a ring, audible and visual alerts help the operator read depth from the steel tape at the borehole.

    Q: How is water level detected?
    A: The water level component works by water conductivity and alerts when the probe contacts water.

    Q: What accuracy is listed?
    A: The listed measurement accuracy is plus or minus 1 mm.

    Q: What field records are needed?
    A: Keep borehole number, magnetic ring depth, previous reading, current reading, groundwater level, and operator notes together.

Reviews

Robert Taylor

The weir flow meter is well-built and delivers accurate measurements. Great value for water management applications.

Christopher Martinez

Very satisfied with the readouts & data loggers. User-friendly interface and supports multiple sensor inputs.

Latest Inquiries

To protect the privacy of our buyers, only public service email domains like Gmail, Yahoo, and MSN will be displayed. Additionally, only a limited portion of the inquiry content will be shown.

Mia***@gmail.comNetherlands

Dear team, we are interested in your readouts & data loggers compatible with multiple sensors. Do yo...

Harper***@gmail.comIndia

Dear Sir, we are planning to procure a complete monitoring system including strain gauges, tiltmeter...

Not finding what you're looking for?
Contact our consultants for more available products.

Request A Quote Now

GET IN TOUCH

If you are interested in our products or want to become our partner.

Please leave your contact information, our team will contact you as soon as possible.

Contact Us Now
Copyright © Kingmach Measurement & Monitoring Technology Co., Ltd.
get a quote
Your Name:
E-mail:*
Company:
Phone/WhatsApp:
Content: